MinutesJul26

Introduction

Minutes of the Integration meeting, July 26, 2007

Attending

  • Meeting attendees: Charles Huang, Rob Gardner, Tim Silvers, Tim Cartwright, Horst, Karthik, Arvind, Jeff Porter, Xin, Stu Martin
  • Apologies: Anand

VTB Issues (Suchandra)

  • VDT waiting for SGE ws-gram module
    • VDT will cut VDT 1.8.0 without module and try to include it in 1.8.1
    • SGE specific issue, doesn't affect ws-gram
  • Questions about pegasus 2.0.1
    • Pegasus team is working with Alain and will submit it to Alain
    • Timeline for 2.0.1 is not clear
    • Charles testing pegasus by running older test cases against new pegasus release against a vtb installation (1.7.1)
    • May need to return to see whether we need pegasus-worker or the complete pegasus package in the wn-client package, need a stakeholder to clarify this
  • 4 vtb sites (UC, FNAL, LBNL, Caltech)
  • VDT has had breakages earlier and has 2 outstanding issues:
    • ca certificate installations and updates
    • pacman updates of ca certificates not fully working
    • VOMRS configuration updates still has issues
    • release should be next week
  • Need to investigate whether gridmanager/gt4 patches can be integrated into the condor stable release and incorporate it into condor 6.8.6
  • Upgrade from VDT 1.8.0 to 1.8.1 will need a side by side installation using the OLD_VDT_LOCATION method
  • Upgrade process:
    • VDT 1.8.0 release
    • VTB test
    • ITB release and testing based on VDT release
    • VDT 1.8.1 release incorporating fixes and minor updates
    • VTB testing of 1.8.1
    • ITB testing of 1.8.1
    • OSG 0.8.0 release

ITB Readiness

  • subversion repository created and scripts setup to generate pacman cache
  • RobQ
  • Need to have plans for installing and validating storage element
    • should encourage VOs to have workflows that test storage element
    • should check and validation how information about SE is advertised
    • OSG Storage group should be contacted to get their involvement
  • Need to incorporate information service and advertise well defined attributes
  • Need to start discussing documentation and release process for documention
    • Install guide
    • Should have VO roundups and checking (what Abhishek did in the last cycle)

WS gram testing update (Suchandra)

  • Currently running a series of tests (sleep jobs of 30, 60, 120, and 300s) with a varying number of jobs (100, 200, 400, 800, 1600, 3200)
  • Will have tests comparing prima vs. non-prima tests
  • Will have tests with staging in and staging out data
  • Will run tests with condor 6.9.5
  • Other tests will be run over the next days and results will be circulated by end of weekend
  • will create initial draft of performance memo next week with goal of having final version done for executive board within 3 weeks

ITB Central Resources

  • Will discuss at next meeting

ITB BNL Site readiness

  • BNL is setting up a ITB testbed (gateway, 5 worker nodes, 50GB dcache SRM)
    • discussion under way to increase size
    • using vdt dcache installation
    • hardware set up and waiting for software

AOB

  • ws-gram results will be discussed vtb meeting on Aug. 7
  • no vtb meeting next week
  • ITB installfest
    • shoot for 2 weeks from now
    • VDT release next week, need a week for installations and persistent sites to test
    • tentative plan for thurs timeslot (Aug 10?)

-- SuchandraThapa - 16 Jul 2007

Topic revision: r5 - 16 Dec 2008 - 16:16:00 - KyleGross
 
Powered by TWiki
This site is powered by the TWiki collaboration platformCopyright &© by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback