Minutes VTBApr 01

Introduction

  • Attendees: Jeff, Suchandra, Rob, Charles, Alain
  • Apologies:
  • Coordinates: Tuesday, 4:00pm Central; 510-665-5437, #1212
  • Previous meetings, MeetingMinutes

VTB Cycle reports

  • Suchandra's install was successful and grid jobs ran
  • Jeff's notes: VTBReleaseValidationVDT190
  • Both Suchandra and Jeff are upgrading their GUMS server and will test the RSV probes

VDT Release Schedule

  • vdt-191 will be released soon (day or 2). VTB should do installs, run standard tests, & target the following
    • vdt-update-certs will now also provide initial cert deployment - we need to check
    • Condor will be deployed (without option) as 'condor-cron' (sp?) with control commands separate from any local condor - test RSV is functional
  • After a quick turn arround the vtb, vdt 1.9.1 will be re-cached as vdt-1.10.0
    • the length of the turn around depends on current build failure on SLES 9 IA-64
  • Release of vdt-1.10.0 should be by this coming Monday
    • ITB cache will be prepared
    • release documentation will be frozen and copied for ITB edits (Suchandra will check with Kyle)

AOB

  • RSV SE probes status: Last word was they were not yet ready (Jeff will check with Arvind)

%BOTTOMMATTER%

-- JeffPorter - 01 Apr 2008

Topic revision: r5 - 08 Apr 2008 - 17:07:59 - JeffPorter
 
Powered by TWiki
This site is powered by the TWiki collaboration platformCopyright &© by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback